Please refer to the posted link to access the final reports for the Highways project.
There are four reports in total. One summary report and one full report for IR2 as well as IR3.
https://www.dropbox.com/sh/000ouqr9j0r79sr/AAAB1TiKWQehxsrVjte0j1zra?dl=0